Eco SuperSaver Installation Manual

STEP 1 - ON all the electricity device

STEP 2 - Clamp the Live Wire at before meter using Clampmeter to check
POINT TO CHECK
SINGLE PHASE 
(note : 1 Phase has 2 incoming wire - Live + Neutral)

3 PHASE
(note : 3 Phase has 3 LIVE + 1 Neutral)



STEP 3 - Read the Ampere reading
STEP 4 - If the Reading for 1 phase is less than 15A, 1 Unit 15A ESS can be use, if more (e.g. 17Amp need 25A ESS) and if more than 25A - need more than 2 unit per phase

Post a Comment

  © Blogger template Foam by Ourblogtemplates.com 2009

Back to TOP